A new transformer is a large investment, and it often travels a long way, by sea, by road and over rough site access, before it reaches your substation. Damage in transit, wrong specifications and manufacturing defects all happen. Testing on site before acceptance protects you: if something is wrong, it is found while the supplier […]
When a transformer trips on a fault, gets flooded, or sits out of service for months, the pressure to switch it back on is enormous. Production is stopped, tenants are complaining and the generator is burning diesel. But energising a damaged transformer can turn a repairable fault into a total loss, and in the worst […]
Your complete guide to ensuring Transformer longevity, performance, and safety.