    Voltage Fluctuation From the Grid: How to Protect Your Equipment With Surge Protection and Stabilisers

    Ask any facility manager in Nigeria and they will describe the same problems: lights that dim and brighten, air conditioners that fail early, electronics that die after a storm, and the bang when grid supply returns after an outage. Unstable voltage costs businesses and homes a great deal in damaged equipment. Most of that damage […]

    Post Image
    28 Oct, 2026
    Posted by: corustartech
    0 comment

    7 Tests Every Nigerian Facility Should Do Before Accepting a New Transformer

    A new transformer is a large investment, and it often travels a long way, by sea, by road and over rough site access, before it reaches your substation. Damage in transit, wrong specifications and manufacturing defects all happen. Testing on site before acceptance protects you: if something is wrong, it is found while the supplier […]

    Post Image
    25 Oct, 2026
    Posted by: corustartech
    0 comment

    11 kV or 33 kV Supply? What Nigerian Businesses Should Know Before Applying to Their DisCo

    Once a business outgrows a low-voltage connection, the next step is to take supply at medium voltage through its own transformer. In Nigeria that usually means 11 kV or 33 kV from the local distribution company (DisCo). The choice affects your equipment cost, your reliability and how easily you can expand later. Here is what […]

    Post Image
    23 Oct, 2026
    Posted by: corustartech
    0 comment

    Earthing in Lagos Soil: Why Your Earth Resistance Changes Between the Dry and Rainy Season

    Many facility managers are surprised when an earth pit that tested well during the rains gives a much higher reading a few months later. It is not a faulty meter. Soil resistance changes with moisture, and in Nigeria the difference between the rainy and dry seasons can be large. Earthing designed only on a wet-season […]

    Post Image
    21 Oct, 2026
    Posted by: corustartech
    0 comment

    Changeover Switch or ATS Panel? Choosing the Right Option for Grid and Generator Supply

    Almost every building in Nigeria needs to switch between grid supply and a generator. The device that does this, a changeover switch or an automatic transfer switch (ATS), is one of the most important parts of the installation. Get it wrong and you risk damaged equipment, a back-feed into the DisCo network, or a generator […]

    Post Image
    18 Oct, 2026
    Posted by: corustartech
    0 comment

    Underground Cable Faults in Lagos: How We Find the Fault Without Digging Up the Whole Road

    When an underground cable fails, the supply to a building, estate or factory can go off for days. The old approach was to dig along the cable route until the damage was found. In a city like Lagos, where cables run under roads, paved compounds and other people’s property, that is slow, expensive and disruptive. […]

    Post Image
    16 Oct, 2026
    Posted by: corustartech
    0 comment

    Is Your Transformer Safe to Switch On After a Fault? A Return-to-Service Checklist

    When a transformer trips on a fault, gets flooded, or sits out of service for months, the pressure to switch it back on is enormous. Production is stopped, tenants are complaining and the generator is burning diesel. But energising a damaged transformer can turn a repairable fault into a total loss, and in the worst […]

    Post Image
    14 Oct, 2026
    Posted by: corustartech
    0 comment

    Why Hiring the Wrong Electrician Could Cost You Far More in the Long Run

    There is a common temptation when managing facility projects or electrical installations — cut costs by going with the cheapest option available. It seems like a smart financial decision at the time. But what happens when that decision comes back to haunt you months or even years later? At Corustar Technological Services, we recently carried […]

    Post Image
    09 Mar, 2026
    Posted by: corustartech
    0 comment

    Importance of Electrical Load Assessment for Buildings in Nigeria

    This blog post delves into why load evaluation prevents overload, improves system efficiency, and ensures safe electrical installations

    Post Image
    07 Mar, 2026
    Posted by: corustartech
    0 comment

    Voltage Drop in Electrical Installations: Causes, Effects & Prevention

    This guide explains the causes of voltage drop, its effects on electrical systems, and practical methods electricians use to prevent it.

    Archives

    Categories

    Archive

    November 2026
    MTWTFSS
     1
    2345678
    9101112131415
    16171819202122
    23242526272829
    30 

    Recent Posts

    Electrical safety test label on a 3-pin plug, part of PAT testing for workplace and home electrical compliance.
    17 May, 2025

    Electrical Safety in the Workplace and at Home

    Electrical safety forms the bedrock of secure environments, yet often

    Good electrical installation work shown in a neatly wired distribution board with Schneider components and color-coded wiring.
    16 May, 2025

    Foundations of a Good Electrical Installation Work

    Building a truly safe electrical system starts beneath the surface. Di